Hyundai Azera: Evaporative Emission Control System
Positive Crankcase Ventilation (PCV) Valve Repair procedures
Description and OperationFront Strut Assembly Repair procedures
Replacement
1.
Remove the front wheel & tire (A).
Tightening torque:
88.3 ~ 107.9N.m (9.0 ~ 11.0kgf.m, 65.1 ~ 79.6lb-ft)
Be careful not to damage to the hub bolts ...
TJ Joint Repair procedures
Replacement
•
Special grease must be applied to the driveshaft joint. Do not substitute with another type of grease.
•
The boot band should be replaced with a new on ...
Voice Command List
• Common Commands: These commands can be used in most operations. (However a
few commands may not be available during certain operations)
FM/AM radio commands: available during FM, ...