Description |
ICM (Integrated Circuit Module) Relay Box Repair procedures
Inspection
Two Turn Unlock Relay
Check for continuity between the terminals.
1.
There should be continuity between the No.18 and No.17
terminals when power and ground are connected to the No. ...
General Information
Basic Service Symbols
There are five primary symbols used to complement
illustrations. These symbols indicate the part to apply such materials
during service.
SymbolMeaningDo not reuse the p ...
Rear Cross Member Repair procedures
Replacement
1.
Remove the rear wheel & tire (A).
Tightening torque:
88.3 ~ 107.9N.m (9.0 ~ 11.0kgf.m, 65.1 ~ 79.6lb-ft)
•
Be careful not to damage to the hub bo ...