Hyundai Azera: Drive Belt Repair procedures
| Removal and Installation |
| 1. |
Disconnect the battery negative terminal. |
| 2. |
To release the tension, turn the drive belt tensioner counterclockwise then remove the drive belt (A).
|
| 3. |
Installation is reverse order of removal |
Drive Belt Components and Components Location
Idler Components and Components LocationSuspension mounting bolts
Check the suspension connections for looseness or damage. Retighten to the specified
torque. ...
Idler Repair procedures
Removal and Installation
1.
Remove the drive belt.
(Refer to Timing System - "Drive Belt")
2.
Remove the drive belt idler (A).
Tightening torque :
52.9 ~ 57.9N.m (5.4 ~ 5.9kgf.m, 39.1 ~ ...
Master Cylinder Repair procedures
Removal
1.
Turm ignition switch OFF and disconnect the negative (-) battery cable.
2.
Remove the air duct (B) and air cleaner assembly (A).
3.
Disconnect the brake fluid level switch conne ...