Hyundai Azera: BJ Boot Repair procedures
| Replacement |
| 1. |
Remove the front driveshaft.
(Refer to Driveshaft Assembly - “Front Driveshaft”) |
| 2. |
Remove the TJ joint assembly.
(Refer to Driveshaft Assembly - “TJ Joint”) |
| 3. |
Remove the dynamic damper.
(Refer to Driveshaft Assembly - "Dynamic Damper") |
| 4. |
Using a plier or flat-tipped (-) screwdriver, remove the BJ boot bands (A).
|
| 5. |
Remove the BJ boot. |
| 6. |
Install in the reverse order of removal.
|
BJ Boot Components and Components LocationRelay Box (Passenger Compartment) Components and Components Location
Components
...
Heated Oxygen Sensor (HO2S) Repair procedures
Inspection
1.
Turn the ignition switch OFF.
2.
Disconnect the HO2S connector.
3.
Measure resistance between the HO2S terminals 3 and 4.
4.
Check that the resistance is within the speci ...
CVVT (Continuously Variable Valve Timing) System Description and Operation
Description
Continuous Variable Valve Timing (CVVT) system advances or
retards the valve timing of the intake and exhaust valve in accordance
with the ECM control signal which is calculated by ...